Colton Constructors was selected as the General Contractor for the 18,000 sf office and test facility for Case New Holland in Casa Grande, AZ. The project is located on a 10 acre developed site with loading ramp/dock, wash bay, small dyno test building, and a fuel containment area. The office side of the bulding included two siding colors, a horizontal metal panel accent band and intergrated stone wainscot. The shop area roof height was 35′ to allow for 25′ high overhead doors and shop cranes designed for 5-20 ton bridge cranes. The building was designed for future expansion, and has a concrete deck mezzanine used for parts storage. The project was completed on time in 7 months including all metal building design, fabrication, and erection to meet the overall project scehdule.
Ollmann Ernest Martin Architect
Case New Holland
Casa Grande, Arizona