Projects

CNH Arizona Field Test Facility

CNH Arizona Field Test Facility
CNH Arizona Field Test Facility
CNH Arizona Field Test Facility
CNH Arizona Field Test Facility

Project Description

Colton Constructors was selected as the General Contractor for the 18,000 sf office and test facility for Case New Holland in Casa Grande, AZ. The project is located on a 10 acre developed site with loading ramp/dock, wash bay, small dyno test building, and a fuel containment area. The office side of the bulding included two siding colors, a horizontal metal panel accent band and intergrated stone wainscot. The shop area roof height was 35′ to allow for 25′ high overhead doors and shop cranes designed for 5-20 ton bridge cranes. The building was designed for future expansion, and has a concrete deck mezzanine used for parts storage. The project was completed on time in 7 months including all metal building design, fabrication, and erection to meet the overall project scehdule.

Architect

Ollmann Ernest Martin Architect

Owner

Case New Holland

Location

Casa Grande, Arizona