This 60,000 heavy maintenance hanger was constructed adjacent to their existing maintenance hanger and included 72′ concrete tilt up panels that acted as a fire wall. Scope of work also included a AFF fire sprinkler system, grounding system, adjacent pump house and site improvements. Dynair is a repeat client of Colton.
John Smales Architects
Dynair Tech of Arizona
Dynair Tech of Arizona