Projects

Current Projects

F-35 Maintenance Hanger, Luke AFB

F-35 Maintenance Hanger, Luke AFB

Colton acted as the Pre-Engineered building Sub on this Design/Build project.

Embraer

Embraer

Executive jet manufacturer in Mesa, Arizona.

Dimension Aviation

Dimension Aviation

Colton constructed two 40,000 sf tail door additions, expanded the offices, parking facilities and plane storage area.

Dynair Tech

Dynair Tech

This 60,000 heavy maintenance hanger was constructed adjacent to their existing hanger.

Scottsdale Aire Plaza

Scottsdale Aire Plaza

Colton was responsible for the shell construction and tenant improvements.

Porsche Chandler

Porsche Chandler

New 36,491 sf. 2 story, ground up dealership located on 4 acres, achieved LEED Gold certification.

Earnhardt Lexus on Camelback

Earnhardt Lexus on Camelback

This new car facility consisted of a 65,270 sf two story new car dealership.

Subaru Superstore Surprise

Subaru Superstore Surprise

​Colton was the General Contractor on this two story, 57,890 sf new car dealership.

Autobahn Collision Center

Autobahn Collision Center

This new 33,212 sf Automotive Collision Repair Facility is located on 5.25 acres.

Subaru Superstore of Chandler

Subaru Superstore of Chandler

This 35,000 sf new Subaru dealership is located on a 6 acre site.

Santan Volkswagen

Santan Volkswagen

This was the first Volkswagen dealerships in AZ to be constructed under the new image program.

Ford of Surprise

Ford of Surprise

Ford of Surprise was a 57,660 sf new car dealership located on a 15 acre site in Surprise Arizona.

Acura of Tempe

Acura of Tempe

New ground up Acura dealership located on 5 acres in the Tempe Autoplex.

Honda Cars of Mesa

Honda Cars of Mesa

Honda Cars of Mesa was the first Honda dealership in Arizona to build in the new Honda image program.

Hyundai of Tempe

Hyundai of Tempe

Colton Constructors was the Design/ Build contractor for this 45,000 sf dealership located on a 5 acre site.

Steve Coury Ford

Steve Coury Ford

Colton constructed a new 25,000 sf Ford dealership in Camp Verde, AZ for Steve Coury Ford.

2200 @ Fountainhead

2200 @ Fountainhead

This 3 building complex included a complete renovation and up dating of some basic buildings that were constructed in the 1970's.

Scottsdale Road Equities

Scottsdale Road Equities

The two story office building was the last building in a three building project.

Talons - Building 5 Expansion

Talons - Building 5 Expansion

Project consisted of a 30,000 square foot pre-engineered metal building (PEMB) storage addition.

Sunstate Equipment Colton, CA

Sunstate Equipment Colton, CA

Colton Constructors was chosen as the General Contractor for the 18,000 sf office, service bays and wash bay.

American Barcode & RFID

American Barcode & RFID

Architects to create a unique facility within the project budget. The project earned McGraw Hill's Best of award in two categories.

Vendia

Vendia

Venida is comprised of five individual buildings totaling 80,000 sf and is located on a 6 acre site.

CORNWELL PROPERTIES

CORNWELL PROPERTIES

Colton Constructors constructed two buildings for Cornwell Corporation at their site located in Scottsdale, AZ.

A to Z Equipment

A to Z Equipment

Colton Constructors completed a 130,000 sf addition to the 45,000 sf building Colton completed earlier.

MESA COLD STORAGE

MESA COLD STORAGE

This 40,000 sf freezer included approximately 30,000 sf of minus ten degree warehouse space with the remainder being office and cooler/staging space.

Reddy Ice

Reddy Ice

Colton handled all of the pre engineered building / insulated panel work and the general contracting work.

CYPRESS MINE

CYPRESS MINE

Colton constructors was responsible for the construction of a new warehouse expansion, addition of two story offices, machine shop and the re sheeting of the existing structure.

SOUTHWEST SPECIALTY FOODS

SOUTHWEST SPECIALTY FOODS

Southwest Specialty Foods specialized in specialty food items including hot sauces, specialty food items. The 50,000 sf facility tilt up building featured a 2 story office, retail area and a production facility. Colton Constructors was the General Contractor on this project.

Lone Cactus Chiller Building

Lone Cactus Chiller Building

Colton Constructors, Inc. acted as the General Contractor on this 60,000 sf 38 degree Cooler Building located in Bouse, Arizona.

UniFirst

UniFirst

​Colton Constructors was chosen to construct a new production facility for UniFirst

L & H Industrial

L & H Industrial

This design/build project was a multi phase project where the exsisting operation took priority to the construction project.

CNH Arizona Field Test Facility

CNH Arizona Field Test Facility

Colton Constructors was selected as the General Contractor for the 18,000 sf office and test facility for Case New Holland in Casa Grande, AZ.

P&H MINE PRO SERVICES

P&H MINE PRO SERVICES

Colton Constructors was selected as the General Contractor/ Pre Engineered Subcontractor for a major Expansion to the P&H Mine Pro Facility located in Mesa, AZ. This project includes a state of the art Weld Shop with two 100 ton bridge cranes with 40' hook height,multiple jib cranes, expansion to their 30 ton crane system, new paint/ sandblast facility, New Gas Tank Farm to support the welding operations, 93 KW Photovotolic system, new two story tilt up office building and renovation of the existing offices, and all site improvements. This major renovation/addition was constructed with little shutdown to the shop.

UniFirst Laundry Addition

UniFirst Laundry Addition

This Design/Build addition included a long bay pre-engineered building with a concrete tilt up exterior.

SMITH PROPERTIES

SMITH PROPERTIES

This is 110,000 sf distribution facility was another of several projects completed for Smith Properties.

Reliable West Moving & Storage

Reliable West Moving & Storage

This 40,000 sf design/ build project included a pre engineered structural system, concrete tilt up panel exterior and a standing seam metal roof.

SPELLMAN HARDWOODS DISTRIBUTION BLDG.

SPELLMAN HARDWOODS DISTRIBUTION BLDG.

Spellman Properties is a long time repeat client of Colton Constructors. Colton has completed other facilities for the owner including their Flagstaff operation and their Manufacturing plant in Phoenix. The subject building is a 80,000 sf concrete tilt up building with a pre engineered structural and a standing seam roof. Included in our scope of work with the coordination of the building with the rail spur construction.

VICTORY INDUSTRIAL

VICTORY INDUSTRIAL

​Victory Industrial included an addition and renovation of an existing crane building along with extensive site improvements.

PAYLESS CASHWAYS

PAYLESS CASHWAYS

Colton Constructors constructed the 180,000 sf distribution building for Payless Cashways.

Kaufman and Brode Mobile Home Mfg. Plant

Kaufman and Brode Mobile Home Mfg. Plant

This 120,000 sf manufacturing plant was constructed on a Design/Build basis and featured multiple interior cranes.

Cornell/Cookson Door Manufacturing Facility

Cornell/Cookson Door Manufacturing Facility

​Colton Constructors was chosen as the Pre Engineered building subcontractor for the new Cookson Door Manufacturing Facility.

Chandler WWT

Chandler WWT

Colton Constructors furnished and erected the pre engineered structures that covered the water treatment facilities.

MORTON SALT

MORTON SALT

Morton Salt needed to construct a new roof over their west valley production facility due to the deterioration of the existing structure. Colton installed the caisson foundation system and structural system around their existing facility and then removed the wood structure below.

RUAN TRUCKING

RUAN TRUCKING

New Facility for Ruan Trucking.

WASTE MANAGEMENT TRUCK FACILITY

WASTE MANAGEMENT TRUCK FACILITY

This truck facility was a complex pre-engineered building project and included overhead bridge cranes, cantilevered hose reels, multiple types of exterior panels and large 28' clear rollup doors.

ORGANICS BUILDING

ORGANICS BUILDING

​Colton Constructors was chosen as the Pre Engineered building subcontractor for the steel and erect of the building exterior shell. This project features an American Buildings pre engineered building. Due to the opens of the project the interior is free of columns for the 180' clear span structure. Due to the corrosive atmosphere inside the building the steel was pre painted with an epoxy paint. The exterior wall system consisted or architectural metal panels and a daylight lite panel to utilize the natural light. With the utilization of Tekla on the pre engineered structural we were able to closely coordinate many of the details of the project.

P&H MINE PRO SERVICES - STEEL

P&H MINE PRO SERVICES - STEEL

​P&H Mine Pro Services Mining Equipment

Cannon AFB Warehouse

Cannon AFB Warehouse

Colton Constructors was selected as the pre-engineered building contractor for the design and construction of the pre-engineered Warehouse and classified storage facility at Cannon Air Force Base, New Mexico for the Arm Corp of Engineers.

F-35 Maintenance Hanger, Luke AFB

F-35 Maintenance Hanger, Luke AFB

Colton acted as the Pre-Engineered building Sub on this Design/Build project.

PHOENIX COUNTRY DAY SCHOOL - BUILDING M

PHOENIX COUNTRY DAY SCHOOL - BUILDING M

This 16,300 sf project was the first of a 3 phase building program for the lower and middle school. This project included extensive site improvements, computer lab, classrooms, science lab and art room. Colton Constructors acted as the general contractor and completed the project within budget and on time. Colton is proud to have Phoenix Country Day School as a client since the early 90's.

UNIVERSAL TECH INSTITUTE

UNIVERSAL TECH INSTITUTE

Colton Constructors constructed this 45,000 sf automotive school in Houston Texas. Colton Constructors has also completed projects for UTI in Phoenix, AZ

Featured Projects

Victory Cart Barn

Talons - Building 5 Expansion

Dynair Tech

Lone Cactus Chiller Building

Earnhardt Lexus on Camelback

Autobahn Collision Center

F-35 Maintenance Hanger, Luke AFB

Subaru Superstore Surprise